Project
Texas A&M, Mosher Hall
MLN Company was awarded the Mosher Hall HVAC Replacement project and will serve as the prime contractor on the project. The project consists of a complete HVAC and Lighting upgrade and has a compressed construction schedule with 78 calendar days to complete the specified scope of work valued at $10+ million. Work will be performed over the 2016 Christmas Break, 2017 Spring Break, and completed in the Summer of 2017.
-
Work Performed
HVAC, MLN Sheet Metal, Fire Protection, Lighting, and all Architectural work.
-
Project Type
Education
-
Location
College Station, Texas
-
Owner/Developer
Texas A&M University, Residence Life a Division of Student Affairs
-
Engineer
JonesDBR Engineering